Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 26 results ...

Abdirad, H (2020) Developing digital project delivery routines around frequent disruptions: How do AEC organizations respond to disruptive information exchange requirements?, Unpublished PhD Thesis, , University of Washington.

  • Type: Thesis
  • Keywords: complexity; reasoning; integration
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2444404087
  • Abstract:
    The unprecedented variation of information integration agendas in the architecture, engineering, and construction industry disrupts the development and maintenance of information exchange routines in firms. This research probed this important emerging phenomenon in three longitudinal ethnographic case-studies. The first case-study answered the question “What types of disruptions do firms experience in working with custom information exchange requirements?” and found that custom information exchange requirements can be disruptive in that they constrain technological and organizational settings and undermine the scope of work, sequence of actions, and timeline of enacting routines in practice. To understand organizational responses to such disruptions, the second case-study offered answers to the question of “how firms perceive, interpret, and act upon disruptive information exchange initiatives in a project?”, thereby revealing three reasoning mechanisms that underpin organizational responses: deductive, inductive, and abductive. With temporary nature of individual projects that limit opportunities to balance abductive and inductive reasoning (important for endogenous improvement of routines), firms are likely to identify and enact solutions that are temporary in nature, highly divergent from existing routines, and therefore, not durable nor effective in contributing to the refinement of information exchange routines. The third case-study complemented these findings by answering to the question “How do firms perceive and respond to the surge of disparate information exchange initiatives in a multitude of projects?” This case spotlighted the shifting loci of information integration in firms, wherein the custom information integration requirements in individual projects undermine internal information integration among projects, portfolios, and operations in firms. This study also revealed that practitioners either separated custom and durable logics of their practice or they found effective strategies to meld them. Based on these insights, this dissertation conceptualized genericity-complexity trade-off in information exchange routines to explain how firms develop routines around the frequent disruptions. Generic routines facilitate addressing custom information exchange requirements with ad hoc and temporary responses in projects, while complex routines systemized, coordinated, and distributed responses within and among different projects and organizational constellations. This research discusses the implications of genericity-complexity trade-off in information exchange routines for internal information integration and knowledge sharing in firms.

Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia, Unpublished PhD Thesis, , University of Washington.

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration, Unpublished PhD Thesis, , University of Washington.

Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings, Unpublished PhD Thesis, , University of Washington.

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives, Unpublished PhD Thesis, , University of Washington.

Gambatese, J A (1996) Addressing construction worker safety in the project design, Unpublished PhD Thesis, , University of Washington.

Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects, Unpublished PhD Thesis, , University of Washington.

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains, Unpublished PhD Thesis, , University of Washington.

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach, Unpublished PhD Thesis, , University of Washington.

Lee, N H (2009) A framework for developing new visualization schemes for construction project performance monitoring, Unpublished PhD Thesis, , University of Washington.

Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers, Unpublished PhD Thesis, , University of Washington.

Lewis, N S (2023) Development of an open-source methodology for simulation of civil engineering structures subject to multi-hazards, Unpublished PhD Thesis, , University of Washington.

Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions, Unpublished PhD Thesis, , University of Washington.

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction, Unpublished PhD Thesis, , University of Washington.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management, Unpublished PhD Thesis, , University of Washington.

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss, Unpublished PhD Thesis, , University of Washington.

Pathak, C (2021) Electric vehicle infrastructure decision support system, Unpublished PhD Thesis, , University of Washington.

Pratama, L A (2023) Immersive visualization intervention on pull planning, Unpublished PhD Thesis, , University of Washington.

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms, Unpublished PhD Thesis, , University of Washington.

Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects, Unpublished PhD Thesis, , University of Washington.

Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims, Unpublished PhD Thesis, , University of Washington.

Tench, B (2022) Designing restoration: Protecting and restoring our attention through participatory design, Unpublished PhD Thesis, , University of Washington.

Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications, Unpublished PhD Thesis, , University of Washington.

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction, Unpublished PhD Thesis, , University of Washington.

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel, Unpublished PhD Thesis, , University of Washington.

Zokaei Ashtiani, M (2022) Data-driven sustainability assessment in roadway infrastructure construction, Unpublished PhD Thesis, , University of Washington.